Contract for Works
This contract is made on 21 November 2026 between:
- Eleni Papadakis, of 12 Ermou Street, 105 63 Athens, Greece ("the Client"); and
- Petr Dvorak Carpentry, of Husova 8, 110 00 Prague, Czechia CZ12345678 ("the Contractor").
The Contractor will carry out the work described below and deliver the agreed result to the Client, and the Client will pay the price, on these terms. "The Law" in this contract means the law stated in section 14.
1. The work and the result
1.1 The Contractor will carry out the following work and deliver this result ("the Work"): design, build and install a fitted oak bookcase, 2.4 m wide and 2.6 m high, in the living room, with five adjustable shelves and a matt lacquer finish.
1.2 The Work is done at: the Client's apartment at 12 Ermou Street, Athens.
1.3 The Contractor is hired for the result, not for working hours. The Contractor decides how, when and with whom to do the Work, within the dates in this contract, and answers for the result.
1.4 The Contractor will do the Work with proper skill and care, with materials of good quality that suit their purpose, and in line with the law, safety rules and any permit or licence that the Work needs. The Contractor confirms that they hold every licence and registration that the Law requires for the Work.
2. Dates
2.1 The Contractor will start on 11 January 2027 and finish and hand over the Work on 26 February 2027.
2.2 If the Client's delay, or a change the Client asks for, makes the date impossible, the date moves by the time lost. The Contractor will tell the Client in writing as soon as they see a risk of delay, and why.
2.3 If the Contractor is late for a reason that is not the Client's, the Client may set a fair final date in writing. If the Work is still not delivered, the Client may end this contract and claim the loss it causes, as far as the Law allows.
3. Price and payment
3.1 The Client will pay the Contractor the total price of EUR 4,800 for the Work. Tax and materials.
3.2 The price is paid as follows: 30 percent on signing, 40 percent when the carcass is installed, and 30 percent on acceptance of the finished work.
3.3 The Contractor will send an invoice or receipt for each payment. The Client will pay within 10 days of receiving it. Late payment carries the interest that the Law allows.
3.4 The price is fixed. It changes only for a change agreed under section 5, or where the Law requires.
3.5 If a payment is more than 14 days late after a written reminder, the Contractor may pause the Work until it is paid, as far as the Law allows, and the dates move by the time lost.
4. Materials, access and the Client's help
4.1 The Client will give the Contractor the access to the place, the water, power and information that the Work reasonably needs, on the dates agreed, and will not obstruct the Work.
4.2 Materials and items the Client supplies must be fit for use. The Contractor will check them on delivery and tell the Client at once if they are unsuitable. The Contractor is not liable for a defect that comes from a Client item they warned about.
4.3 Materials delivered to the place stay at the risk of the Contractor until the Client accepts the Work. Ownership of materials passes to the Client when they are paid for or built into the Work, whichever is first.
4.4 The Contractor will keep the place safe and tidy while working, protect the Client's property and the parts of the place not being worked on, and remove their waste, tools and leftover materials when the Work is finished.
4.5 Each side obtains the permits, approvals and notices that the Law places on it. Unless the sides agree in writing that the Contractor will do it, the Client obtains any planning or building permit for the Work and the consent of a landlord, neighbour or owners' association. The Contractor holds its own trade licences and gives any notice, test or certificate that the Law requires from the person doing the work, such as for electrical, gas or structural work. The Contractor will tell the Client before starting what is needed, and neither side starts work that needs a permit before it is granted.
5. Changes
5.1 Either side may ask for a change to the Work. No change counts until both sides have agreed it in writing, including its price and effect on the dates. Email is enough.
5.2 The Contractor will not refuse a small change that the Client reasonably asks for, and will give a price for it within a few working days.
6. Handover and acceptance
6.1 When the Work is finished, the Contractor will tell the Client, and the Client will inspect it within 7 days.
6.2 If the Work matches this contract, the Client will sign a handover note and accept it. If it does not, the Client will list the faults in writing within that time, and the Contractor will put them right within a fair time. The Client then inspects again.
6.3 The Client may not refuse to accept the Work for a minor fault that does not stop its use, but may keep back a fair part of the price until it is put right.
6.4 If the Client uses the Work, or does not inspect or answer within the time in 6.1 after the Contractor's notice, the Work is treated as accepted, unless the Law says otherwise.
6.5 At handover the Contractor gives the Client the guarantees, manuals and care instructions for the Work and the materials and equipment in it.
7. Defects
7.1 The Contractor is responsible for any defect that was there at handover or that appears within 24 months from acceptance and comes from the Contractor's work or materials. The Contractor will put it right, free of charge and within a fair time, after the Client reports it.
7.2 If the Contractor does not do so, the Client may have it put right by someone else at the Contractor's cost, or ask for a reduction in the price, or end the contract for a serious defect, as far as the Law allows.
7.3 The Contractor is not responsible for damage that comes from wrong use, lack of care, wear and tear, or changes by someone else.
8. Late completion
If the Contractor does not hand over the Work by the date in 2.1, and the delay is not due to the Client or a cause beyond the Contractor's control, the Contractor will pay: 0.2 percent of the price for each working day of delay, up to 5 percent of the price. The sides agree that this sum is a fair estimate of the loss a delay is likely to cause, not a punishment. Where the Law requires a written demand first, the sum runs from the day the Client sends one. If the Law lets the Client claim a greater loss that it proves, any sum paid under this section is deducted from that claim. Where the Law requires it, the Client keeps the right to this sum only by reserving it in writing when accepting the Work, for example in the handover note.
9. Insurance, liability and risk
9.1 The Contractor is responsible for the loss or damage that they or their staff cause while doing the Work, and will hold insurance for it where the Law or the nature of the Work calls for it.
9.2 The risk of loss of or damage to the Work stays with the Contractor until acceptance, and then passes to the Client.
9.3 Nothing in this contract limits a liability that cannot be limited by law, such as for death or personal injury caused by negligence, or for fraud.
10. Subcontractors and staff
The Contractor may use helpers or subcontractors, and is responsible for them as for their own work. The Contractor will pay them, and the taxes, insurance and contributions that the Law requires, and the Client has no duty to them. This contract does not make the Contractor the Client's employee, partner or agent.
11. Ending the contract early
11.1 Either side may end this contract with written notice if the other commits a serious breach and does not put it right within 7 days of a written request.
11.2 The Client may end the contract at any time by written notice, and will then pay for the work done up to that day and the materials ordered, plus any other loss that the Law allows the Contractor to claim.
11.3 If the contract ends early, the Contractor will hand over the work done so far and the Client's items, and the sides will settle the account within 14 days.
12. Confidentiality and the Contractor's rights
12.1 Each side will keep private anything non-public that it learns about the other from this contract, unless it must disclose it by law or to its advisers.
12.2 The Client owns the finished Work. The Contractor may keep and show photographs of it in their portfolio, unless the Client asks in writing for the place or the people shown to be kept out.
13. General
13.1 This contract is the whole agreement about the Work and replaces earlier promises. A change must be in writing and agreed by both sides.
13.2 A notice must be in writing and sent to the address at the top of this contract, or by email to an address the other side has used, and counts as received when delivered.
13.3 Neither side may transfer this contract to anyone else without the other's written consent.
13.4 If any part cannot be enforced, the rest stays in effect. A delay in using a right is not a waiver of it.
13.5 Each side keeps a signed copy. This contract may be signed in separate copies and by electronic signature where the Law allows. Any right that the Law gives a consumer cannot be taken away by this contract.
14. Governing law and disputes
This contract is governed by the law of Greece. The sides will first try in good faith to settle any dispute by talking. If that fails, the courts of Athens decide it, without taking away any right to use a court or service that the Law gives a consumer.
Signatures
The Client: Eleni Papadakis
Signature: ______________
Date: ______________
The Contractor: Petr Dvorak Carpentry
Signature: ______________
Date: ______________