Handover protocol for completed works

Record the handover of finished works: the state, defects to fix, keys, documents and warranty start.

Handover protocol for completed works template, first page

Fill it in and preview

Handover protocol

Project: Kitchen and bathroom renovation, 12 Rue des Lilas
Address of the works: 12 Rue des Lilas, 69003 Lyon, France
Contract: C-2027-014 of 3 March 2027
Date works completed: 15 June 2027
Date of handover: 18 June 2027

Parties

Client: Camille Laurent
Client's representative: Hugo Laurent, brother

Contractor: Atelier Dubois Rénovation SARL
Contractor's representative: Marc Dubois, site manager

1. Works handed over

Full renovation of the kitchen and bathroom on the second floor, including plumbing, electrics, tiling and fitted units.

The parties inspected the works together on 18 June 2027.

State of the works: Complete, with minor defects to fix

2. Defects and unfinished work

The defects and unfinished work found at the inspection are listed here. The contractor will fix them by the dates shown, at its own cost, unless the contract says otherwise.

Defect or missing work Place Fix by
Paint touch-up on skirting Kitchen 25 June 2027
Silicone gap at bath edge Bathroom 25 June 2027

Defects the client reports and the contractor does not accept:
Client says the worktop edge is chipped. Contractor says it was like that on delivery. To be checked by the supplier.

By signing, the client keeps all rights for the defects and unfinished work listed in this protocol, including the points in dispute, and for any agreed sum for late completion. Defects that are not listed here and appear later can still be reported under the warranty, the contract and the law.

3. Readings and tests

Electricity 14,208 kWh, water 311 m3. Pressure test of pipes passed on 15 June 2027.

4. Documents, permits and certificates

Document Copies
Electrical safety certificate 1
Appliance manuals and guarantees 1
As-built drawings 2

Permits, inspections and certificates:
Final electrical inspection passed 15 June 2027. No occupancy permit needed for this work.

5. Systems shown and follow-up check

Utilities, systems and equipment shown:
Boiler, consumer unit and water shut-off valve shown and explained to the client.

Date to check that the listed defects are fixed: 26 June 2027

6. Keys and access

3 front door keys, 1 alarm code card

From the date of handover the client is responsible for the keys, for the security of the works and for insuring them, unless the contract says otherwise.

7. Warranty and payment

Warranty period: 24 months from the date of handover
Payment still due or held back: 5% held until the defects above are fixed

The handover does not remove the contractor's duty to fix defects under the contract and the law that applies. Periods that the law sets for hidden or serious defects run in addition to the warranty period above.

8. Client's remarks

Client asks for the paint colour to be checked in daylight.

Signatures

By signing, the parties confirm that this protocol records the state of the works on 18 June 2027.

Client: Camille Laurent

Signature: ______________________ Date: ______________

Contractor: Marc Dubois, site manager, for Atelier Dubois Rénovation SARL

Signature: ______________________ Date: ______________

Templates are a careful starting point, not legal advice. Where the law matters, check what applies where you are.

Operations and quality

What this template is for

A handover protocol for completed building or renovation works: what was handed over, defects, keys, documents, warranty and signatures. Free, Word or PDF.

It is free to fill in online, needs no account, and downloads as a Word document or a PDF. See all Operations and quality templates

Operations and quality

What you fill in

The form asks for 22 details. The document fills itself in as you type.

  • Project or works

    For example: Kitchen and bathroom renovation, 12 Rue des Lilas

  • Address of the works

    For example: 12 Rue des Lilas, 69003 Lyon, France

  • Contract number and dateoptional

    For example: C-2027-014 of 3 March 2027

  • Date the works were completedoptional

    Often earlier than the handover. Say which date starts the warranty in your contract.

    For example: 15 June 2027

  • Date of handover

    For example: 18 June 2027

  • Client (receiving party)

    For example: Camille Laurent

  • Client's representativeoptional

    For example: Hugo Laurent, brother

  • Contractor (handing over)

    For example: Atelier Dubois Rénovation SARL

  • Contractor's representative

    For example: Marc Dubois, site manager

  • Works handed over

    What is covered, and anything left out on purpose.

    For example: Full renovation of the kitchen and bathroom on the second floor, including plumbing, electrics, tiling and fitted units.

  • State of the works

    For example: Complete, with minor defects to fix

  • Defects and unfinished workoptional

    One row for each item. Say who fixes it and by when.

    For example: Paint touch-up on skirting | Kitchen | 25 June 2027 Silicone gap at bath edge | Bathroom | 25 June 2027

  • Defects the contractor does not acceptoptional

    Keep points in dispute apart from the agreed defects, so signing does not mean agreeing.

    For example: Client says the worktop edge is chipped. Contractor says it was like that on delivery. To be checked by the supplier.

  • Meter readings and testsoptional

    For example: Electricity 14,208 kWh, water 311 m3. Pressure test of pipes passed on 15 June 2027.

  • Documents handed overoptional

    Manuals, certificates, drawings and guarantees given to the client.

    For example: Electrical safety certificate | 1 Appliance manuals and guarantees | 1 As-built drawings | 2

  • Permits, inspections and certificatesoptional

    Approvals the law or contract requires before use, and whether each is done.

    For example: Final electrical inspection passed 15 June 2027. No occupancy permit needed for this work.

  • Utilities, systems and equipment shownoptional

    Anything the client was shown how to use or switch off.

    For example: Boiler, consumer unit and water shut-off valve shown and explained to the client.

  • Date to check the defects are fixedoptional

    For example: 26 June 2027

  • Keys and access items handed overoptional

    For example: 3 front door keys, 1 alarm code card

  • Warranty (defects liability) period

    Take it from your contract. The law often sets its own periods that run alongside it, longer for serious building defects, and a contract cannot shorten them for a consumer.

    For example: 24 months from the date of handover

  • Payment still due or held backoptional

    Some laws cap the amount held back, often at 5 percent, or say when it must be released or paid to a third party.

    For example: 5% held until the defects above are fixed

  • Client's remarksoptional

    For example: Client asks for the paint colour to be checked in daylight.

Operations and quality

What is inside

The parts of this document, in order.

  1. 1Parties
  2. 21. Works handed over
  3. 32. Defects and unfinished work
  4. 43. Readings and tests
  5. 54. Documents, permits and certificates
  6. 65. Systems shown and follow-up check
  7. 76. Keys and access
  8. 87. Warranty and payment
  9. 98. Client's remarks
  10. 10Signatures

Templates

How it works

  1. 01

    Fill in

    Type your details in the form. The document fills itself in as you type; click any gap to jump to its field.

  2. 02

    Check

    Read it through. Gaps you have not filled stay marked, so nothing goes out half done.

  3. 03

    Download

    Save it as a Word document to edit further, or as a PDF to send or print.

Make it yours with AI

Open it in the chat and ask for changes: shorter, firmer, another situation, another language.

Adapt it with nerix

Operations and quality

Questions people ask

What details does this template ask for?

The form asks for 22 details, starting with Project or works, Address of the works, Date of handover, Client, Contractor. 13 more are optional.

Can I download this template as Word or PDF?

Yes. When you have filled in the form, save it as a Word document to keep editing, or as a PDF to send or print. It is free and needs no account.

Is what I type sent anywhere?

No. What you type stays in your browser while you fill in the document. It only goes to nerix if you choose to open the template in the chat.

What should I check before I use this template?

Signing a handover can start the warranty period, the final payment and the end of the contractor's risk. In some countries a defect or a delay penalty that you knew of and did not reserve at handover is lost, and the law may give only a short time after it to report visible defects. Laws also set their own liability periods for building defects, often 1 to 10 years depending on the country and how serious the defect is, and some cap retention or say when it must be released. Rules and deadlines differ by country and contract: check yours, and list every defect you see before you sign. Suited to construction, renovation and real estate.

Are these operations templates free?

Most are. Fill in and download them for free as Word or PDF, with no account. A few longer documents are premium: free to fill in, paid once to download, and marked with their price.

Do they meet a standard such as ISO 9001?

They are a practical starting point and certify nothing. Standards and safety laws differ by industry and country, so check what applies to you.

Who should approve a procedure?

The person who owns the process and a manager who can authorise it. The procedure template has fields for both, and for the review date.