Handover protocol
Project: Kitchen and bathroom renovation, 12 Rue des Lilas
Address of the works: 12 Rue des Lilas, 69003 Lyon, France
Contract: C-2027-014 of 3 March 2027
Date works completed: 15 June 2027
Date of handover: 18 June 2027
Parties
Client: Camille Laurent
Client's representative: Hugo Laurent, brother
Contractor: Atelier Dubois Rénovation SARL
Contractor's representative: Marc Dubois, site manager
1. Works handed over
Full renovation of the kitchen and bathroom on the second floor, including plumbing, electrics, tiling and fitted units.
The parties inspected the works together on 18 June 2027.
State of the works: Complete, with minor defects to fix
2. Defects and unfinished work
The defects and unfinished work found at the inspection are listed here. The contractor will fix them by the dates shown, at its own cost, unless the contract says otherwise.
| Defect or missing work | Place | Fix by |
|---|---|---|
| Paint touch-up on skirting | Kitchen | 25 June 2027 |
| Silicone gap at bath edge | Bathroom | 25 June 2027 |
Defects the client reports and the contractor does not accept:
Client says the worktop edge is chipped. Contractor says it was like that on delivery. To be checked by the supplier.
By signing, the client keeps all rights for the defects and unfinished work listed in this protocol, including the points in dispute, and for any agreed sum for late completion. Defects that are not listed here and appear later can still be reported under the warranty, the contract and the law.
3. Readings and tests
Electricity 14,208 kWh, water 311 m3. Pressure test of pipes passed on 15 June 2027.
4. Documents, permits and certificates
| Document | Copies |
|---|---|
| Electrical safety certificate | 1 |
| Appliance manuals and guarantees | 1 |
| As-built drawings | 2 |
Permits, inspections and certificates:
Final electrical inspection passed 15 June 2027. No occupancy permit needed for this work.
5. Systems shown and follow-up check
Utilities, systems and equipment shown:
Boiler, consumer unit and water shut-off valve shown and explained to the client.
Date to check that the listed defects are fixed: 26 June 2027
6. Keys and access
3 front door keys, 1 alarm code card
From the date of handover the client is responsible for the keys, for the security of the works and for insuring them, unless the contract says otherwise.
7. Warranty and payment
Warranty period: 24 months from the date of handover
Payment still due or held back: 5% held until the defects above are fixed
The handover does not remove the contractor's duty to fix defects under the contract and the law that applies. Periods that the law sets for hidden or serious defects run in addition to the warranty period above.
8. Client's remarks
Client asks for the paint colour to be checked in daylight.
Signatures
By signing, the parties confirm that this protocol records the state of the works on 18 June 2027.
Client: Camille Laurent
Signature: ______________________ Date: ______________
Contractor: Marc Dubois, site manager, for Atelier Dubois Rénovation SARL
Signature: ______________________ Date: ______________