Facility management checklist
Building or site: Northgate Business Park, Unit 4
Facility manager or inspector: Hana Yoshida
Date of round: 2 February 2027
Main service contractor: BrightServe Facilities
Tick each item that is in good order. Write every fault, who will fix it and by when, in the notes.
Building and grounds
☐ Roof, gutters and drainage are clear and free of leaks
☐ Walls, floors, ceilings and windows are in good repair
☐ Doors, locks and closers work properly
☐ Car park, paths and outdoor lighting are safe and clear
☐ Signs and wayfinding are clear and in place
☐ Accessible entrances, ramps, lifts and accessible toilets are usable
☐ Risks such as trip hazards, loose fittings and unsafe glass are logged
Heating, cooling and air
☐ Heating and cooling work and rooms reach a comfortable temperature
☐ Filters are clean or replaced on schedule
☐ Ventilation and extract fans run without noise or blockages
☐ Plant rooms are clean, locked and free of stored goods
Water and power
☐ No leaks, drips or damp patches
☐ Hot water is at the right temperature and taps run clear
☐ Lighting works and failed lamps are replaced
☐ Electrical boards are closed, labelled and accessible
☐ Backup power or emergency lighting has been tested
☐ Water hygiene checks and temperature tests are done as the rules require
☐ Energy and water meters are read and compared with the last round
Safety and security
☐ Fire exits, alarms and extinguishers are checked and in date
☐ Lifts and any lifting equipment have valid inspection records
☐ First aid kits are stocked and easy to find
☐ Alarm, CCTV and access control systems work
☐ Keys and access cards are accounted for
☐ Evacuation plan is displayed and drills are recorded
☐ Fire doors close fully and are not wedged open
☐ Hazard registers, such as for hazardous building materials, are current
Cleaning and waste
☐ Cleaning is done to the agreed schedule and standard
☐ Toilets and kitchens are clean and stocked
☐ Waste and recycling are collected and bins are not overflowing
☐ Pest control checks are up to date
Contractors and records
☐ Service visits are logged with dates and reports
☐ Statutory test and inspection certificates are filed
☐ Open repair requests are listed with an owner and a date
☐ Budget for repairs and planned maintenance is reviewed
☐ The next round is booked
☐ Asset register and maintenance schedule are up to date
☐ Contractor insurance, licences and permits to work are checked
☐ Complaints and requests from building users are reviewed
☐ Warranties, manuals and as built drawings are filed
Notes
Items to follow up, who is responsible and by when.
