A form for site staff and subcontractors to report work or material that differs from the drawings, the specification or the agreed plan, often called a non-conformance report (NCR). It records the place, the drawing reference, what was required, what was found, whether it is covered up, the cause, the immediate action, the effect on cost and schedule, the proposed fix and who must approve it. Each deviation is one answer, so they can be sorted and followed up.
Questions
- Project or site * (short answer)
- Exact location (building, floor, room, grid line) * (short answer)
- Date found * (date)
- Reported by (name and role) * (short answer)
- What it concerns * (choose one)
- Workmanship
- Material or product
- Drawing or specification
- Subcontractor work
- Sequence or planning
- Safety
- Environment
- Other
- Drawing, specification or detail reference (number and revision) (short answer)
- What the drawing, specification or plan required * (long answer)
- What was actually found or built * (long answer)
- Is the work already covered up or built over? (choose one)
- No
- Partly
- Yes
- Effect on the finished building * (choose one)
- Cosmetic only
- Minor, can be accepted as is
- Needs repair or rework
- Affects strength, safety or use
- Not known yet
- What it affects (choose any)
- Cost
- Schedule
- Other trades
- Warranty
- Permit or approval
- Nothing known
- Likely cause (long answer)
- Immediate action taken (long answer)
- Proposed fix (repair, rework, replace or accept as is) (long answer)
- Who must approve the fix? (choose one)
- Site manager
- Designer or engineer
- Client or their representative
- Building inspector or authority
- Not sure
- Is work stopped in this area? * (choose one)
- Yes
- No
- Partly
- Contractor or trade responsible (short answer)
- Fix needed by (date)
- Photo reference or link (short answer)
- Your email, for questions (email address)
- I agree that the people running this form keep my details to handle this report. * (tick to agree)