# How to Run a Risk Register in a Small Company

Source: https://nerix.ai/blog/how-to-run-a-risk-register

A risk register in plain steps for a small company: what to list, how to score likelihood and impact, who owns each risk and how often to review it.

The nerix team Published October 31, 2026 7 min read

Quality and audits risk

In this guide

## Key takeaways

- Use a simple three by three scale, which is enough for a small company.
- For every risk choose one of four answers:
- A six person design studio lists these risks:
- If you work toward ISO 9001 or 27001, the register is the document an auditor asks for first, and corrective actions often start as a risk that happened.

A risk register is a short list of what could go wrong in your business, with a score for each, an owner and a plan. A small company can run one in an afternoon and review it once a month. The trick is to keep it small, specific and alive: ten to twenty risks, each with a person's name next to it.

Download the [risk register template](https://nerix.ai/templates/risk-register) to follow along, or use the [risk assessment template](https://nerix.ai/templates/risk-assessment) for a single activity.

## Step 1: Find the risks

Do not start from a blank page. Ask the team four questions and write down every answer:

- What would stop us serving customers for a day, a week, a month?

- What would cost us a lot of money suddenly?

- What could hurt a person, a customer or our reputation?

- What do we depend on that only one person or one supplier provides?

Typical small company risks: a key person leaves, a supplier fails, the main customer pays late or leaves, a laptop with customer data is lost, the system you sell from goes offline, a rule changes. Look also at past incidents, complaints and audit findings, which are real evidence of risks that already happened.

## Step 2: Describe each risk clearly

A vague line cannot be managed. Write it as cause, event and effect:

- Weak: "Supplier risk."

- Better: "Our only packaging supplier is late or closes (cause and event), so orders ship late for weeks (effect)."

## Step 3: Score it

Use a simple three by three scale, which is enough for a small company.

| Score | Likelihood | Impact |

| 1 | Unlikely this year | Small, fixed within a day |

| 2 | Could happen | Costly or slow, customers notice |

| 3 | Likely | Serious: major loss, harm or legal trouble |

Multiply the two numbers. A score of 6 or 9 is high and needs action now, 3 or 4 needs a plan, 1 or 2 you watch.

Tip

Argue about the score for two minutes, not twenty. The act of discussing matters more than whether you chose 2 or 3.

## Step 4: Decide what to do

For every risk choose one of four answers:

- **Reduce it.** Add a second supplier, back up the files, train a second person.

- **Avoid it.** Stop doing the risky thing.

- **Transfer it.** Insurance, a contract clause, an outside service.

- **Accept it.** Write down that you accept it and why, for low risks.

Write the action as a task with a date: "Find a second packaging supplier by 15 January." Track it in [tasks and projects](https://nerix.ai/product/work) so it is not forgotten.

## Step 5: Give each risk an owner

One name, not "the team". The owner watches the risk, does or assigns the action, and reports changes at the review. An owner without time or authority is not an owner, so check.

## Step 6: Review on a rhythm

- **Monthly, 20 minutes.** Go through the high risks and the actions due.

- **Every quarter.** Re-score everything and add new ones.

- **After any incident.** Did it show a missing risk or a wrong score?

- **Yearly.** Feed the register into your management review.

Try it on your own work.

nerix writes the first draft, answers from your documents with the page each sentence came from, and keeps the team's work in one place. Start on the free plan.

Start free

## A worked example

A six person design studio lists these risks:

| Risk | L | I | Score | Action | Owner |

| Only one person can run the client portal | 2 | 3 | 6 | Document and train a second person by March | Ana |

| Laptop with client files lost or stolen | 2 | 3 | 6 | Disk encryption on all laptops this month | Sam |

| Biggest client (40 percent of income) leaves | 1 | 3 | 3 | Win two new clients this year | Lee |

| Accounting software outage at invoice time | 2 | 1 | 2 | Accept; export invoices monthly | Ana |

Four rows, four owners, four dates. That is a working register.

## Common mistakes

- **Copying a generic list.** The register must describe your business.

- **Scoring everything high.** Then nothing stands out.

- **No review.** An out of date register is worse than none, because it gives false comfort.

- **Hiding it.** The team that sees the risks every day knows them best. Share the register.

## Where it connects to quality work

If you work toward ISO 9001 or 27001, the register is the document an auditor asks for first, and corrective actions often start as a risk that happened. See [checks](https://nerix.ai/product/audits) for running internal audits, and our guide on [corrective actions that fix the cause](https://nerix.ai/blog/corrective-actions-that-fix-the-cause).

## Risk levels and what to do at each

A score only helps if it triggers action. Agree in advance what each level means:

| Score | Level | What happens |

| 6 to 9 | High | Action starts this month. The owner reports at every monthly review. A manager signs off if you decide to accept it. |

| 3 to 4 | Medium | A plan with a date within the quarter. Reviewed every quarter. |

| 1 to 2 | Low | Watch. Accept in writing or fix when convenient. |

This keeps meetings short, because you only talk about the top of the list. If more than a third of your risks are high, you are probably scoring too harshly, or the business really has a problem that needs a bigger plan than a register.

## Types of risk to check

If you are stuck for ideas, walk through these groups and ask whether each applies to you:

- **People.** Key person leaves, illness, hiring takes too long, a safety hazard on site.

- **Customers and money.** One customer is most of your income, late payment, price pressure, refunds.

- **Suppliers.** Single supplier, price rise, delivery delays, quality problems.

- **Operations.** Equipment fails, stock runs out, a process depends on one spreadsheet.

- **Information and technology.** Lost devices, phishing, no backups, a service outage.

- **Legal and rules.** A new regulation, a missing licence, a contract clause you did not read.

- **Reputation.** A bad review, a public mistake, a complaint that spreads.

- **Outside events.** Weather, power cuts, transport strikes, a pandemic.

Pick the three or four that could really hurt you, not all of them.

## Opportunities too

Some teams add a second column for opportunities, things that could go better than planned, such as a new market or a repeat order. It is optional, but the same scoring works, and it keeps the register from becoming a list of worries.

## Records an auditor will ask for

For ISO 9001 or ISO 27001, keep evidence that risks were identified, scored, treated and reviewed. The register itself, the dates of the monthly reviews, the closed actions and the notes of the management review are the proof. You do not need a long procedure, only a register that is used. When you plan an internal audit, choose a few risks from the register and check that the action really happened. This is the simplest way to make audits useful, and it turns the register from a document into a habit.

## Keep the register short enough to use

A register with 200 lines is read by nobody. For a company of 10 to 50 people, 15 to 30 live risks is normal. If you have more, group the small ones ("minor IT faults", "routine supplier delays") into one line and keep the separate lines for risks that could really hurt the business. Move closed risks to a second tab instead of deleting them, so you can show later that you looked at them.

Write each action so a stranger could tell whether it was done. "Improve backups" cannot be checked. "Test a restore of the accounts folder from last week's backup, by 15 December, Maria" can. Each action needs one named person and a date, and the next review should start with the overdue ones.

Watch for the same score everywhere. If every risk is a 3 for likelihood and a 3 for impact, the scale is not helping you decide. Ask which two risks you would fix first if you only had a week, and compare those two against each other. The order you end up with is usually more useful than the numbers.

Finally, record what you decided not to do. Accepting a risk is a legitimate choice, but write down who accepted it and why, for example "the cost of a second supplier is higher than a two week delay would cost us". That line is what you want to find when someone asks a year later.

## The short version

List real risks as cause, event and effect, score each on a three by three scale, choose reduce, avoid, transfer or accept, give every risk an owner and a dated action, and review monthly. Ten good rows beat a hundred copied ones.

## Questions people ask

What is a risk register?

It is a list of things that could go wrong, how likely and how serious each one is, what you will do about it, and who owns it. It is a working document, not a report you file away.

How many risks should a small company list?

Ten to twenty real ones are better than a hundred copied from a guide. If nobody can say what they would do about a risk, it probably does not belong on the list yet.

Do ISO standards require a risk register?

ISO 9001 and ISO 27001 both expect you to identify and handle risks, and to keep evidence. A register is the usual way. The standards do not prescribe a format, so keep it simple.

n/

About the author

The nerix team

The nerix team writes these guides in plain words for small teams, with templates you can fill in and use today.

Share this guide

-
- [Email](mailto:?subject=How%20to%20run%20a%20risk%20register%20in%20a%20small%20company&body=https%3A%2F%2Fnerix.ai%2Fblog%2Fhow-to-run-a-risk-register)
- [LinkedIn](https://www.linkedin.com/sharing/share-offsite/?url=https%3A%2F%2Fnerix.ai%2Fblog%2Fhow-to-run-a-risk-register)
- [X](https://x.com/intent/post?url=https%3A%2F%2Fnerix.ai%2Fblog%2Fhow-to-run-a-risk-register&text=How%20to%20run%20a%20risk%20register%20in%20a%20small%20company)

One tap, no account. We keep a count and nothing else.

## Templates for this

Fill one in online and download it as Word or PDF. Free, no account, and what you type stays in your browser.

- ### [Risk register](https://nerix.ai/templates/risk-register) List what could go wrong, how likely and how bad, who owns it and what you will do about it. Fill it in
- ### [Risk assessment](https://nerix.ai/templates/risk-assessment) Find what could go wrong, score it, decide what to do about it and record who will do it. Fill it in

## In nerix

- [Checks](https://nerix.ai/product/audits)
- [Tasks and projects](https://nerix.ai/product/work)
- [Templates](https://nerix.ai/templates)

## Try it on your own work.

nerix writes the first draft, answers from your documents with the page each sentence came from, and keeps the team's work in one place. Start on the free plan.

Start free See the plans

## Keep reading

- Quality and audits iso [Quality and audits](https://nerix.ai/blog/category/quality-and-audits) November 1, 2026 7 min read ### [ISO 9001 checklist for small businesses](https://nerix.ai/blog/iso-9001-checklist-for-small-businesses) An ISO 9001 checklist for small businesses, clause by clause, with the records the standard requires, what auditors sample and common delays. Read the guide
- [Quality and audits](https://nerix.ai/blog/category/quality-and-audits) October 21, 2026 5 min read ### [Your first internal audit, step by step](https://nerix.ai/blog/quality-first-internal-audit-step-by-step) How a small business can plan, run and close its first internal audit: scope, questions, evidence, findings, corrective actions and what to do afterwards. Read the guide
- Quality and audits iso [Quality and audits](https://nerix.ai/blog/category/quality-and-audits) November 1, 2026 7 min read ### [ISO 27001 for small teams, a 90 day plan](https://nerix.ai/blog/iso-27001-for-small-teams) ISO 27001 for small teams in plain steps. Who does what, how to scope it, a 90 day plan to audit readiness, what to skip and how certification works. Read the guide
- [risk](https://nerix.ai/blog/tag/risk)
- [quality](https://nerix.ai/blog/tag/quality)
- [iso](https://nerix.ai/blog/tag/iso)